Labor cost is the total a business spends to have people do the work: wages and overtime at minimum, and, in a fully loaded view, employer payroll taxes, benefits, and paid leave too. For shift-based teams it is often the biggest cost you can change week to week, and most of it gets decided when you build the schedule.
- Define the scope first. Wage-only and fully loaded numbers answer different questions.
- Match the dates. Labor and sales must cover the same period.
- Plan, then compare. Scheduled cost is an estimate; timecards and payroll are the truth.
- Hours are not the only lever. Overtime, coverage, and timing often matter more.
Wage-only vs. fully loaded labor cost
Before you quote a labor number, say which one you mean.
| Measure | Includes | Best for |
|---|---|---|
| Wage-only | Gross wages, including overtime premiums | Weekly scheduling decisions |
| Fully loaded | Wages plus employer payroll taxes, benefits, paid leave, and insurance | Pricing, budgets, and hiring |
| Labor cost % | Labor cost ÷ sales for the same period | Comparing weeks and locations |
For crews billed by the job, job costing assigns the same labor to individual jobs instead of to a week.
A practical rhythm: track wage-only cost every week from the schedule and timecards, and fully loaded cost monthly, once tax and benefit figures are final.
How to calculate labor cost
- Pick the period. A shift, day, or week, with sales and labor covering the same dates.
- Total wages. Hours × rate by role, plus overtime pay premiums.
- Decide what to load. Add employer taxes, benefits, and paid time off for a fully loaded view.
- Divide by sales. Labor cost ÷ sales × 100 gives labor cost percentage.
- Compare plan to actual. Check scheduled cost against approved timecards for the same dates.
Both percentages are correct. They just answer different questions, so label which one you are reporting.
Example: reading a labor cost variance
Illustrative example
A café's week, planned vs. actual (wage-only)
- Planned
- 100 hours × $18 = $1,800 against $8,000 forecast sales: 22.5%.
- Actual
- 112 hours × $18 = $2,016 against $7,200 actual sales: 28%.
- Cause
- 12 extra hours ($216) covered a catering event, and sales came in $800 under forecast.
- Decision
- Judge the event on its own sales; keep the regular weekly baseline.
Two things moved at once: hours went up and sales went down. Read both before cutting anyone's shifts.
Labor cost FAQs
How do you calculate labor cost percentage?
Divide total labor cost by total sales for the same period, then multiply by 100. For example, $950 in labor against $4,000 in sales is 23.75%.
Does labor cost include payroll taxes?
It depends on the measure. Wage-only labor cost leaves them out; fully loaded labor cost includes employer payroll taxes, benefits, and paid leave. Say which one you are using.
How can I lower labor cost without cutting hours?
Prevent avoidable overtime, match staffing to demand by hour, cover gaps with shift swaps instead of last-minute overtime, and fix timecard errors before payroll.
How Teamsly helps with labor cost
Teamsly puts labor cost on the schedule while you build it, then checks it against real hours.
Labor cost you can see before you spend it
What each step looks like in Teamsly.
Run your own numbers with the restaurant labor cost calculator, then read how to reduce labor costs without cutting hours.
See next week's labor cost before you publish
Build a schedule and watch labor cost and overtime update in the live demo, or start free with no credit card.
Reviewed November 2026 by the Teamsly team. Product details reflect Teamsly feature pages at the time of review. General information, not financial, tax, or payroll advice.